Latest articles

Inside Forsee Power’s battery production plant in Poitiers (France)

Situated on a brownfield investment dated 2018, the facility was previously used as a diesel engine piston plant. The industrial site spans 10,000 square meters for production, with an additional 2,500 square meters dedicated to components and 2,000 square meters for shipping operations. Forsee Powe...

Highlights

Nikola in need of new source of money to continue its business

Media reports say that the manufacturer has got the money to survive no longer than one quarter in 2025. Nikola managed to sell something like 200 hydrogen fuel cell trucks in the first 3 quarters of the year. At the same time, the company has been facing trouble for quite a long time, with the need...
News

forsee power

Inside Forsee Power’s battery production plant in Poitiers (France)

Situated on a brownfield investment dated 2018, the facility was previously used as a diesel engine piston plant. The industrial site spans 10,000 square meters for production, with an additional 2,500 square meters dedicated to components and 2,000 square meters for shipping operations. Forsee Powe...